Oracle
This project involved a near full floor fitout in the AMP Building in Auckland CBD. The comms room had a substantial air conditioning system to achieve the desired cooling levels which, provided some challenges due to the size of the area and the work required.
A substantial amount of the office space was designed with exposed ceilings which required Cape to prepare the exposed substrate and co-ordinate all services for installation before painting. This also needed to be co-ordinated with the installation of the full height partitions so services could be run into each room. Feature acoustic cloud panels were then installed in the open area, to not only create a great aesthetic look but also hide some of the AC units and help with the acoustics.