AA Insurance
This was a 4200sqm fitout integrated with the completion of the base-build works, spanning over 3 floors of a brand new building to house over 600 staff. Each floor consisted of a mixture of solid and glazed partitions, with sliding aluminium framed glass doors, hinged doors and frameless glass pivots. In the reception area, full height timber framed glazed partitions and sliders were a feature, as was the white washed polished concrete and the steel clad reception counter.
There was a large joinery package which had kitchens, utilities, café, break-out spaces and even grandstand seating spread over all floors. The joinery scope also grew considerably towards the very end of the project, meaning a quick turnaround of a number of feature units was required.